Tvijo wiki
Каталог

Running a Tvijo pilot and measuring the benefit

A pilot that can be judged: one workflow, one acceptance check, four numbers per week, and exit criteria agreed before the first task.

🎯 Для Sponsors of a pilot

📚 Вы узнаете
  • Agree the gates before the first task
  • Report four numbers per week
  • Define exit criteria in both directions

Эта страница ещё не переведена. Вы читаете английский оригинал.

A pilot is not "let the team try it for a month". It is one workflow, one acceptance check, a fixed set of numbers, and exit criteria agreed before the first task runs. Without those, the only possible result is an opinion.

🧭 Step 1 — pick one workflow, not a department

Good pilot candidates share three properties:

  • the output is checkable (a test passes, a document matches a template, a query returns the expected result);
  • the work is repeated (so a small improvement compounds);
  • a mistake is cheap and visible (so nobody has to trust the pilot blindly).

Bad candidates: anything that ends in a customer-facing promise on day one, anything involving regulated personal data, anything with no acceptance check.

🧭 Step 2 — agree the gates

Gate Question Owner
Data class What may be sent, and what may never be sent? Security / DPO
Accounts Who gets an account, on which route class? Team lead
Budget Daily and per-task caps for the pilot Finance / lead
Actions May the worker write files? Run commands? Deploy? Technical owner
Exit criteria What result ends the pilot — in both directions? Sponsor

Write them down. "We'll see how it goes" is not a gate, and it guarantees that the pilot's cost cannot be attributed to anything.

🧭 Step 3 — measure four numbers, every week

Metric Definition Source
Accepted results Outputs that passed the acceptance check Check log
Cycle time Request → accepted result, not request → first text Timestamps
Cost per accepted result Sum of task receipts ÷ accepted results Usage ledger
Human interventions Manual fixes, re-runs, re-scopes Task log

Two derived numbers are worth reporting but not optimising directly:

  • Rework rate — accepted results ÷ all produced results.
  • Cost of the discarded work — receipts of tasks whose output was rejected. This is the number pilots usually hide, and it is often the largest one in week one.

Do not report "time saved" without a baseline. If the team did not do this work before the pilot, there is nothing to compare against — say so.

🧭 Step 4 — instrument before you start

You need, from day one:

  • the receipt of every task (provider, model, tokens, spend, state);
  • the acceptance check, run by a person or a script, with a timestamp;
  • a count of manual corrections;
  • a list of incidents (data sent by mistake, a wrong action, an outage).

If any of these is missing, the pilot's conclusion will be a story rather than a result.

🧭 Step 5 — weekly review, written

A 20-minute weekly review with a one-page note:

  • what was accepted, what was rejected, and why;
  • cost per accepted result, and its trend;
  • interventions and their causes;
  • one change for next week;
  • risks that appeared.

Four of these notes are worth more than a final slide deck, because they show the trend rather than the summary.

➡️ Exit criteria — both directions

Agree in advance what would make you:

  • expand (accepted-result ratio above X, cost per accepted result below Y, no data incidents);
  • stop (ratio below X after two iterations, an unresolved data incident, or a cost curve that does not bend).

A pilot with only an expansion criterion is a purchase with extra steps.

🚧 When this does NOT work

  • You cannot define acceptance. Then you cannot measure anything; fix that first.
  • The workflow is not repeated. One-off work cannot show a trend.
  • You need a guarantee of savings. Tvijo gives you receipts, not a promise. Savings are computed from your before/after numbers.
  • The team cannot change its process. A tool that is bolted onto an unchanged process usually shows cost without benefit — and that is a valid finding.

➡️ Next

Источники

Each source was opened by a human on the date shown. Product behaviour is described from this deployment, not from marketing material.

  1. Usage tab · Tvijo · Проверено 2026-10-27
  2. Workspace manual · Tvijo · Проверено 2026-10-27
  3. Connections and cost illustration · Tvijo · Проверено 2026-10-27
  4. AI OS working rules · GitHub · Проверено 2026-10-27

💬 Комментарии

Комментарии публичны и модерируются. Не публикуйте персональные данные.
  • Комментариев пока нет. Будьте первым!

Следующие шаги