Running a Tvijo pilot and measuring the benefit

A pilot that can be judged: one workflow, one acceptance check, four numbers per week, and exit criteria agreed before the first task.

🎯 For Sponsors of a pilot

πŸ“š You will learn
  • Agree the gates before the first task
  • Report four numbers per week
  • Define exit criteria in both directions

A pilot is not "let the team try it for a month". It is one workflow, one acceptance check, a fixed set of numbers, and exit criteria agreed before the first task runs. Without those, the only possible result is an opinion.

🧭 Step 1 β€” pick one workflow, not a department

Good pilot candidates share three properties:

  • the output is checkable (a test passes, a document matches a template, a query returns the expected result);
  • the work is repeated (so a small improvement compounds);
  • a mistake is cheap and visible (so nobody has to trust the pilot blindly).

Bad candidates: anything that ends in a customer-facing promise on day one, anything involving regulated personal data, anything with no acceptance check.

🧭 Step 2 β€” agree the gates

Gate Question Owner
Data class What may be sent, and what may never be sent? Security / DPO
Accounts Who gets an account, on which route class? Team lead
Budget Daily and per-task caps for the pilot Finance / lead
Actions May the worker write files? Run commands? Deploy? Technical owner
Exit criteria What result ends the pilot β€” in both directions? Sponsor

Write them down. "We'll see how it goes" is not a gate, and it guarantees that the pilot's cost cannot be attributed to anything.

🧭 Step 3 β€” measure four numbers, every week

Metric Definition Source
Accepted results Outputs that passed the acceptance check Check log
Cycle time Request β†’ accepted result, not request β†’ first text Timestamps
Cost per accepted result Sum of task receipts Γ· accepted results Usage ledger
Human interventions Manual fixes, re-runs, re-scopes Task log

Two derived numbers are worth reporting but not optimising directly:

  • Rework rate β€” accepted results Γ· all produced results.
  • Cost of the discarded work β€” receipts of tasks whose output was rejected. This is the number pilots usually hide, and it is often the largest one in week one.

Do not report "time saved" without a baseline. If the team did not do this work before the pilot, there is nothing to compare against β€” say so.

🧭 Step 4 β€” instrument before you start

You need, from day one:

  • the receipt of every task (provider, model, tokens, spend, state);
  • the acceptance check, run by a person or a script, with a timestamp;
  • a count of manual corrections;
  • a list of incidents (data sent by mistake, a wrong action, an outage).

If any of these is missing, the pilot's conclusion will be a story rather than a result.

🧭 Step 5 β€” weekly review, written

A 20-minute weekly review with a one-page note:

  • what was accepted, what was rejected, and why;
  • cost per accepted result, and its trend;
  • interventions and their causes;
  • one change for next week;
  • risks that appeared.

Four of these notes are worth more than a final slide deck, because they show the trend rather than the summary.

➑️ Exit criteria β€” both directions

Agree in advance what would make you:

  • expand (accepted-result ratio above X, cost per accepted result below Y, no data incidents);
  • stop (ratio below X after two iterations, an unresolved data incident, or a cost curve that does not bend).

A pilot with only an expansion criterion is a purchase with extra steps.

🚧 When this does NOT work

  • You cannot define acceptance. Then you cannot measure anything; fix that first.
  • The workflow is not repeated. One-off work cannot show a trend.
  • You need a guarantee of savings. Tvijo gives you receipts, not a promise. Savings are computed from your before/after numbers.
  • The team cannot change its process. A tool that is bolted onto an unchanged process usually shows cost without benefit β€” and that is a valid finding.

➑️ Next

Sources

Each source was opened by a human on the date shown. Product behaviour is described from this deployment, not from marketing material.

  1. Usage tab Β· Tvijo Β· Checked 2026-10-27
  2. Workspace manual Β· Tvijo Β· Checked 2026-10-27
  3. Connections and cost illustration Β· Tvijo Β· Checked 2026-10-27
  4. AI OS working rules Β· GitHub Β· Checked 2026-10-27

πŸ”— Article connections

Open the full knowledge graph β†—

πŸ’¬ Comments

Comments are public and moderated. Do not post personal data.
  • No comments yet. Be the first!

Next steps